Pin 9 would go to the plus supply that powers your inductive loads.
If it where to be connected to GND, the loads would turn on, hence the application as a lamp test.
Pin 9 would go to the plus supply that powers your inductive loads.
If it where to be connected to GND, the loads would turn on, hence the application as a lamp test.