You are best looking at the connections with a continuity meter and seeing what terminals connect to what other other terminals in each of the switch position. There are three or four ways it could be arranges so you will have to investigate.
You are best looking at the connections with a continuity meter and seeing what terminals connect to what other other terminals in each of the switch position. There are three or four ways it could be arranges so you will have to investigate.