Wasn't my idea, I was just building to his requirements. I did consider wireless switching rather than a set sequence but then you have the issues on site of remote control, batteries, filth. He may require an upgrade in the future but his only other option is a very unreliable industrial unit they have on site that cost about 4 grand. Rarely working and the size of a washing machine.
This was my little contribution.
