I see what you are trying to do and I am a big fan of teach a man to fish rather than give him a fish to eat, however you are assuming that I have some level of basic programming foundations.
The problem is I dont and therfore will end up confusing you and myself in the process.
I am afraid that you think I am smarter then what i seem to be, he he.
Here goes nothing I will try and put down my thoughts in laymans terms.
Lets say that at 13H00 we want the servos to start moving.
we check the watch to see what time it is.
If it is 13H00 the servos will be told to start moving.
we need to stop servo P 110 min. and servo M 88 min later respectively.
So we check the watch in each instance to see if those time parameters have been met.
If their respective time frames have been reached we stop each servo accordingly.
I am sorry if I did not quite understand if this is what you were asking of me.