Uno, Motor Shield and Stepper Motors - required voltage and amperage

The motors also have what is called inrush current, you will need to supply that when they start. Size the power supply for all the loads and then multiply the motor loads by at least 3 and add them to the total. This should get you to a minimum supply to run your loads. By sequencing loads you can cut the power requirement but what happens if there is a fault?